- To date they have stripped all the wall, bonded and skimmed them.
- Done the electrics
- Installed a new floorr
- Installed the bath with taps and plumbing
- Built the stud wall and put the shower in place
- Installed the heated towel rail
- Installed the sink and taps
- Finish the shower
- Install the shower screen
- Tile part of the room
- Fit the lighting and fixtures.
Chances??